Friday, May 16, 2014

Women in Ethiopia struggle to survive without water | MSNBC

  • Thatch-roofed huts that house families of six or more in the mountaintop village of Jarso, Ethiopia.
  • Uchiya Nallo, a 29-year-old mother is eight months pregnant. Here, she descends the side of a mountain where she, her husband and their son live. She makes the journey down to a dry river bed twice a day.
  • After reaching the dry riverbed, women must spend time scratching the dirt until brackish water appears, scoop it into their containers and carry nearly 5 gallons of water up the mountain.
  • Brackish water dug up from a dry riverbed in the southern Konso Region of Ethiopia.
  • Women and young girls are responsible for the collection of water, four times a day, often at distances requiring them to trek across mountains, sometimes during dark periods of the day.
  • A dried-up area of the Sagan River running through Konso, Ethiopia.
  • Mariam Bakaule lives on a hill in Jarso, in southwest Ethiopia. Like other villagers, she gets up at dawn and walks for more than two hours on steep and stony paths to reach the nearest source - a dry river bed. There, she must dig through the sand with bare hands to reach the water and fill her container.
  • A woman who recently gave birth to a daughter clings to life while being carried by men in her village.
  • Yellow jerry cans overflow into the street.  The large containers are the primary vehicle for moving water from river beds to the surrounding villages.
  • A young girl making the common trek from river to home.
  • A villager scene in Teshmale.
  • A newly installed water point in the Ethiopian village of Leyte begins to spurt water for the first time. At first the water emerged brown and murky, but then flowed clean and clear.
  • Two girls hoist their jerry cans to their back for the return trip up to their village of Teshmale in Ethiopia.
  • A group of friends drink a local beer brewed using the unsafe water from riverbeds.
  • A villager in Teshmale refills a serving of locally made beer in front of her home.
  • Twilight sets in the Konso Region along the main road that cuts east-to-west.
1 / 16
Thatch-roofed huts that house families of six or more in the mountaintop village of Jarso, Ethiopia.
Photo by Mustafah Abdulaziz

By Mustafah Abdulaziz and Johnny Simon

In the Konso Region of southern Ethiopia, the struggle for clean, safe water is a daily reality for women and young girls.
“Bringing the water is not a simple task,” says Mariam Bakaule, a mother standing at the edge of the mountaintop village of Jarso. “This is the essence of women. Water and woman are synonymous here.”
The village of Jarso, like many of the others in the area, overlooks a vast valley stretching towards the Kenyan border. Yet the relative greenery of the region is deceptive. For the 13,000 people in Jarso, lack of rain in recent years has caused crops of maize, sorghum and haricot beans to fail.
At the center of this struggle to survive are the women and young girls whose responsibility it is to trek up to five hours a day to reach dry river beds, only to wait in long lines for scant resources. Uchiya Nallo, an eight-months-pregnant 29-year-old mother, spends half her day climbing a mountainside carrying more than 5 gallons (about 40 pounds) of water.
“The road is very dangerous and I feel tired all the time,” she says. “I am worried because sometimes I fall down and hurt myself. I worry because I feel tired. Now I am almost ready to give birth and I am walking slowly but maybe I will have some problems, I’m not sure.”
The correlation between the risk of maternal mortality for women in the developing world and access to safe water and sanitation is little understood. When water is gathered for drinking or washing, any contaminants or infectious agents can have a direct effect on maternal health. Infections and repeated worm infections from unsafe sanitation lead to other risks such as malnutrition, stunted growth and fatal obstructed labor. And the physical strain from carrying the water is itself dangerous, resulting in a higher risk of spinal injury, uterine prolapse, rheumatism hernia and spontaneous abortion.
In some respects, Ethiopia has made important strides toward the United Nations Millennium Goals of reducing maternal mortality. Today, just over half the population has access to water, nearly four times the number in 1990. Yet the country still has a long way to go: While a woman’s lifetime risk of dying during pregnancy and childbirth is 1 in 3800 in the developed world, in Ethiopia it is 1 in 67.
WaterAid, an international non-governmental organization, is one of the groups improving access to clean water among the world’s poor, and has been working in Ethiopia since 1984. In the late afternoon light of May, villagers in Teshmale gather around a new water point constructed by the NGO. When the last of the technical difficulties has been solved, the tap is turned on and water gushes forth, first brown and then a pure, unclouded torrent.
It is the first time the children, long used to the dirty red water from the riverbeds, have seen clear water.
Mustafah Abdulaziz is a documentary photographer based in Berlin, Germany.  His ongoing project, Water, exploring water issues around the world, has received grants from the Pulitzer Center on Crisis Reporting, commissions from the United Nations and WaterAid.

Sunday, May 11, 2014

Egypt to use 'eye-in-the-sky' to monitor their water security


SHARE
 1  11  4  1 GOOGLE +2
 +
Water security in the Middle-East is of the utmost importance. In this region of the world, the use, supply, control, and allocation of water has been politically motivated, as well as a defining issue in many conflicts.
Because the Middle-East is an extremely water-scarce region, any loss of a country's water supply would impact the health of the population as well as the bio-diversity and eco-systems of the country.
In most cases, getting a fair share of the water rights from river systems running through or bordering a country is an elaborate process usually accomplished in three stages. First, a country must assert its claim to the water rights. Then they must receive recognition by the other countries who also use the waters. The final step would be a country finally attaining those water rights, but over the years, this last step has usually ended in political strife, so much so that "non-agreed" water sharing has become the reality.


Read more: http://www.digitaljournal.com/science/egypt-to-use-eye-in-the-sky-to-monitor-their-water-security/article/383326#ixzz31OiC7KVI

Egypt to use 'eye-in-the-sky' to monitor their water security

SHARE
 1  11  4  1 GOOGLE +2
 +
Water security in the Middle-East is of the utmost importance. In this region of the world, the use, supply, control, and allocation of water has been politically motivated, as well as a defining issue in many conflicts.

Because the Middle-East is an extremely water-scarce region, any loss of a country's water supply would impact the health of the population as well as the bio-diversity and eco-systems of the country.

In most cases, getting a fair share of the water rights from river systems running through or bordering a country is an elaborate process usually accomplished in three stages. First, a country must assert its claim to the water rights. Then they must receive recognition by the other countries who also use the waters. The final step would be a country finally attaining those water rights, but over the years, this last step has usually ended in political strife, so much so that "non-agreed" water sharing has become the reality.


Read more: http://www.digitaljournal.com/science/egypt-to-use-eye-in-the-sky-to-monitor-their-water-security/article/383326#ixzz31OiC7KVI

Friday, May 9, 2014

Ethiopia arrests 3 Egyptians near S. Sudan border

Thursday, May 08, 2014
Ethiopian security forces have arrested three Egyptians in Ethiopia's westernmost Gambela region near the border with South Sudan, a senior security source said.

Ethiopian security forces have arrested three Egyptians in Ethiopia's westernmost Gambela region near the border with South Sudan, a senior security source said.
ADDIS ABABA – Ethiopian security forces have arrested three Egyptians in Ethiopia's westernmost Gambela region near the border with South Sudan, a senior security source said.
The source, who spoke on condition of anonymity, said two were arrested while trying to board a public bus bound for Assosa in the Benishangul-Gumuz Region, where Ethiopia is building the multibillion-dollar Renaissance hydroelectric dam on the Nile River.
The third, he added, was seized by Ethiopian citizens while taking pictures of a new dam being constructed on the Baro River, a tributary of the Nile River.
According to the security source, the three Egyptians are currently in police custody in Gambella where they are being interrogated.
He said they had been arrested earlier this week, declining to give their names for security reasons.
The trio was found to have entered Ethiopian territory illegally without registering at any of the four border crossings between Ethiopia and South Sudan, the source said.
They are expected to face charges of illegally entry, holding forged visas and threatening the country's vital facilities, the source said.
The arrest comes amid heightened tension between Egypt and Ethiopia over the Renaissance dam.
The project has raised alarm bells in Egypt, the Arab world's most populous country, which fears a reduction of its historical share of Nile water.
Water distribution among Nile basin states has long been regulated by a colonial-era treaty giving Egypt and Sudan the lion's share of river water.
However, citing its need for development, Ethiopia says it must build a series of dams to generate electricity, both for local consumption and export.
Addis Ababa insists the new dam will benefit downstream states Sudan and Egypt, both of which will be invited to purchase the electricity thus generated.
Copyright © 2014 Anadolu Agency

Saturday, February 15, 2014

Globalising-water-projects - Al-Ahram Weekly


Nile Basin countries should realise that water issues in Africa are not only regional or national concerns, but also global concerns, writes Helmi Shaarawy
I appreciate, in principle, the impact of disputes among the countries of the Nile Basin on the spirit of pan-Africanism and on progress in the development of regional cooperation in the Nile Basin, which is essential for the collective future and comprehensive development of one of the important regions in Africa. It is important to bear in mind that the Nile waters question can no longer be regarded as a purely bilateral or even regional issue, as it intersects with — and has become part of — a larger continental and global water agenda, which renders it less subject to the control of any of the Nile Basin countries than to the views of the planning circles in the World Bank, multinational corporations and other global capital sources. These circles, according to many sources (the most important of which is Rushdi Said), have been discussing mammoth dam and hydraulic projects on rivers since the Hague Conference of 2000, in the course of which they established the principle of water pricing and the role of private firms in water marketing projects. They had in mind 15 major international companies (based in the US, Britain, France and Italy) that they anticipated would invest some $800 billion in water projects.



Africa always occupied a prime position in these plans, which extended from the Senegal River to the Congo, Niger and Zambezi rivers. The costs of the Grand Inga Reservoir projects on the Congo, the fourth phase of which is scheduled for completion in 2025 (and which will have the potential to generate 40,000 Megawatts of electricity), are expected to exceed $80 billion. South Africa and Congo have recently signed a crucial treaty on the Grand Inga Hydropower Project that could become the largest hydroelectric project in the world following a meeting of potential investors in the Congo project in April 2008, under the supervision of the World Energy Council, held with the purpose of generating the necessary funding. The World Bank had committed $10 billion as starting capital for the Grand Inga projects, as well as another $8 billion for the nearby Zambezi projects.



Thus, it is clear that the borders of a local project such as Renaissance Dam (with an expected 6,000 Megawatt capacity at a cost of $5 billion) extend beyond Ethiopia. As considerable as the value of this project is in terms of Ethiopian national development, the diversity of contributors to the project, with respect to the creation of the reservoir, power generation and distribution, and infrastructure (including the railways connecting it to other parts of the area) speak of a major multilateral investment process. In my opinion, the Egyptian public should not read this as a conspiracy against Egypt but rather as a network of interests with respect to which it is important to augment the capacity to penetrate this network so as to transform it, together with Sudan and Ethiopia if possible, into a huge engine for collective development along the lines of the multinational Grand Inga Project. (I should add here, that facts and realities put paid to that commotion stirred by a number of Egyptian technicians advocating a project to link the Congo with the Nile via canals that pierce the mountains and the swamps between there and Sudan, all in order to sideline the Renaissance dam!)



Egypt, Sudan and Ethiopia are not unaware of the importance of working together in the interests of national and regional development. Moreover, it is in their interests not only to generate joint information resources but also joint positions on the project, as global capital does not operate in accordance with local, regional or pan-Arab biases. Indeed, Arab capital, even with some of its political linkages to Egypt, comes into question in this regard.



We also know that the Nile Basin Initiative (NBI), which for some mysterious reason is being jettisoned, had been earmarked for $122 million from the World Bank for activities involving research, confidence building, communications and promotion programmes preparatory for major 3-6 year project programmes (all this is according to a 50-page booklet on the plans and studies for the initiative).



At the same time, I can add that, according to the available information on major Ethiopian surveys conducted in the area of Renaissance Dam project since 2007, and as Rushdi Said himself, pointed out before he passed away in 2012, Ethiopia — unlike both Egypt and Sudan — never submitted a memorandum on the extent of its water needs, as required under international agreements. This is reminiscent of Addis Ababa’s continued delay in the submission of the studies for the dam to the tripartite technical committee. Moreover, one recalls that the World Bank was not absent while these acts of remiss took place. Since 2001, after the initiative was launched, the World Bank pledged to assist the water ministers of the Nile Basin countries to establish a cooperation consortium (CCON) so as to ensure that it would always be close to the group!



 The abundance of information and its simultaneous concealment, in this manner, furnished the arguments and the sources of controversy between the parties concerned in the Nile waters question and crisis. Yet, there is no national agency in any of the Nile Basin countries capable of resolving the matter; nor is there a regional organisation sufficiently strong to assert itself.



However, I anticipate that a new approach will be brought to reading the situation with an eye to “consensus-reaching” either at the regional level, first, or at the level of the sources of global capital, as conflict over such major projects only obstructs progress in the advancement of interests and welfare nationally and regionally. If the financiers in the Congo River basin — as was the case with the Zambezi before this — made it possible for South Africa to lead the investment project outside of its territory and if the DRC (Democratic Republic of the Congo) approved of this so as to become a centre for global investment, I doubt that the Ethiopians would be governed by narrow outlooks when it comes to similar projects with current or future regional or international projects that not only serve developmental interests but also, and perhaps above all, the interests of the international capitalist process.



In light of the foregoing, the globalisation of water projects that encircles the Nile waters crisis leaves little room for “golden solutions”, but it does compel us to exert some effort in a re-examination of the agreements governing the region in accordance with a unified African perspective, to which I am committed.



What most struck me when reading the basic agreements between the Nile Basin states is that they need to be approached more with a political lens than with a legalistic or technical one. This led me to believe that Egyptian and Ethiopian negotiators desire agreement not conflict, and most of the existing agreements for regulating the use of the Nile waters suggest that agreement is possible. The dialogue over the framework agreement for the countries of the Nile Basin is different from the negotiations directly involving the Renaissance Dam. Therefore, it is important to negotiate first over the framework agreement, because it is here we will find the spirit of “consideration for the other” present all along. Indeed, we find this principle already present in the 1959 Nile Waters Agreement, which contains an Egyptian and Sudanese “agreement to discuss together the demands of other countries and to agree on a unified opinion with respect to them”. That provision puts paid to the contention that Khartoum and Cairo had ignored the other parties.



The recent Entebbe Framework Agreement also underscores this principle in its wording regarding “the fair and reasonable use of water resources”, the need to observe the circumstances pertaining to these water resources, including their limited nature, and the commitment not to cause grave harm to other countries.



All such texts and provisions seem to compel towards “dialogue” over principles, rather than mere “negotiations” over details. Once the two countries perceive this they will, of necessity, be propelled towards “agreement” instead of finding themselves forced to bow to the rules and interests of global capitalism and having to negotiate over other vital strategic interests. Such are the anxieties in this respect that one sometimes feels compelled to alert public opinion in both countries of the risk of national interests being subordinated to the interests of global capitalism, by which time conflict and media clamour in Addis Ababa and in Cairo will carry little weight.



Those who are whispering or shouting into the ears of the Nile Basin parties should realise that the circles of global capitalism and all other strategic circles around us must study the interrelated points surrounding the following:



— The statements of Egyptian scientists regarding the subterranean waters in the Western Desert. Most recently, scientist Essam Haggi drew a comparison with water on Mars. Prior to this we have Farouk Al-Baz’s remarks, the most recent of which concerned the rival subterranean river in northern Libya.



—  The reports that have been circulating for some time on French water purification projects along the southern Mediterranean coast, starting from Morocco, and Israeli competition in this project, which embraces the whole of the Middle East.



— Previous policies of the World Bank itself, which had advised Turkey and Syria to resolve their crisis over another international waterway through the construction of small dams rather than through conflict.



—  The need for more precise discussion of meteorological predictions, as any is sufficient to carry significant argumentative weight, whether in the case of the anticipatable floods surrounding the dams or the prospect of draught afflicting this party or that, not to mention the horrors that await from global warming and the melting of the polar icecaps.

The writer is former director of the Arab and African Research Centre, Cairo. This article is dedicated to Rushdi Said, an Egyptian scientist, professor of geology and expert in irrigation, on the first anniversary of his death.

Wednesday, February 5, 2014

E. Nile Council of Ministers Concludes 26th Meeting - Sudan Vision Daily - Details



Debrezeit, Ethiopia - The Eastern Nile Council of Ministers (ENCOM), the highest governing body of the Eastern Nile Subsidiary Action Program (ENSAP) of the Nile Basin Initiative (NBI) has concluded its Meeting today, January 30, 2014 in Debrezeit, Ethiopia. The ENCOM Meeting was preceded by a two-day 27th Meeting of the ENSAPT (Eastern Nile Subsidiary Action Program Team), a technical advisory body to ENCOM. The ENSAPT comprises three senior technical experts and officials from each of the member countries. The ENCOM Meeting was attended by Ethiopia, Sudan and the Republic of South Sudan. Egypt declined to participate continuing on its decision to freeze participation in NBI activities following the signing of the CFA by six upstream member countries of the NBI.



The Ministers noted that the interruption of the ENCOM annual Meetings for the last four years had posed unprecedented challenges to the Eastern Nile Technical Regional Office (ENTRO), the executive arm of ENSAP. The Ministers thanked the Officer-In-Charge (OIC) of ENTRO, ENTRO Senior Management and staff and development partners, particularly the World Bank Nile Team, for having sustained the cooperation and continuing delivering results notwithstanding the hard times and the challenges.



During their deliberation the Ministers pointed out that the finite Eastern Nile water resources are facing progressively increasing pressures from population growth, rapid urbanization, high economic growth rates taking place in the basin and that the pressures are likely to be amplified due to anticipated Climate Change Impacts. They further noted that the rapid pace of water resource infrastructure development in the sub-basin makes coordinated management and operation of these structures imperative.



The Ministers, taking into account the foregoing trends, reiterated that it is high time ENSAP member countries embark expeditiously on instituting Eastern Nile wide, if not Nile Basin wide, adaptive management principles, practices and mechanisms.  Only such cooperative arrangements, they pointed out, will make possible realization of system wide gains in water use efficiency and productivity; minimization of losses; wise and judicious allocation of water across sectors, including the environment and eventually paving the way for turning the Nile as a vehicle for regional integration and promotion of socio-economic development and alleviation of poverty.



The Ministers, concluding their Meeting, emphasized that:

* The common institution of all Eastern Nile countries set up with so much investment in time, money and energy, has been held hostage by the freeze of Egypt and Sudan and its degree of freedom to discharge its responsibilities and deliver results curtailed for four years. The Ministers, therefore, welcome the unfreezing by Sudan and commit themselves to prevent the recurrence of such situations in the future.

* The admission of the Republic of South Sudan into ENSAP/ENTRO marks a phase in Eastern Nile Cooperation whereby cooperation is expanded and deepened. The Ministers register their satisfaction in accepting RSS into the ENSAP family and express their hope that RSS will play constructive role.

* In spite of its continued freezing, ENCOM still reiterates to the sisterly country of Egypt that ENSAP is still open and welcoming and expects their earliest participation.

* They renew their commitment to further Eastern Nile cooperation and have decided to revitalize ENTRO by putting a new Management (Executive Director, Finance and Administration Head, Senior Project Coordinator) in place; by establishing modalities to cover core operation costs on their own; by expediting preparation of investment projects and strengthening the scientific knowledge base (data, information, analytic tools).

* They call on all friends of the Nile to support their renewed effort to advance Eastern Nile cooperation, which they have resolved to carry through, if need be, by their own efforts alone.

* They call upon and invite the private sector and investors within and outside the basin to take part in their investment programs, including through public-private partnerships and to participate in the planned Investment Round Table.

* The Republic of Sudan has offered to hold the next ENCOM meeting in Khartoum, Sudan. ENCOM has accepted the offer with appreciation